Application of vibration percussion in treatment of the foundation of flood control emergency project in liao river 振冲法在辽干防洪应急工程坝基处理中的应用
Combined with xin ' anjiang dam and longyangxia dam , the optimum module ratios are determined as 1 . 0 and 0 . 8 以往坝工界对坝体研究较多,而对坝基研究相对较少。
Design and construction of the chemical grouting for the shale rock dam foundation of the xinanjiang hydroelectric project 新安江水电站坝基页岩化学灌浆试验设计与施工
3d numerical simulation of impact of key fault and fault enhancement on foundation rock mass of guangzhao high gravity dam 光照重力坝坝基断层影响及处理的三维数值模拟
The dam was built with granite and concrete , 90 ft . high and 400 ft . long and was 60 ft . wide at its base 水坝用花岗石和混凝土建造,坝高90尺、宽400尺、坝基厚60尺。
Control of influence of blasting vibration on fresh concrete during excavation of right dam foundation at three gorges project 三峡右岸坝基开挖爆破对临近新浇混凝土影响的控制
This thought and method of studying dam foundation rock mass quality can be extended to other water - power projects 这种研究坝基岩体质量的思路、方法可以推广到其它水电工程。
Analysis of xinanjiang dam no . 2 amp; amp; no . 3 block foundation thick shale softening amp; amp; argillation mechanism amp; amp; tendency 3号坝段坝基厚层页岩软化泥化机理及趋势分析
Application of uncovered heavy single pressure grouting in consdidation grouting for dam foundation of ertan hydroelectic plant 无盖重纯压式灌浆在二滩水电站坝基固结灌浆中的应用
Wang sijing ( 1998 ) geoenvironmental consideration in the strategic planning for development . icimod kathmandu , nepal 王思敬著( 1990 )坝基岩体工程地质力学分析。北京:科学出版社。