ONOFF
划词翻译
导航
建议反馈
词典App

load increase中文是什么意思

  • 载荷增长

"查查词典"手机版

千万人都在用的超大词汇词典翻译APP

  • 例句与用法
  • Meanwhile , the results of program show that , under secondary load , the bonding - reinforced beams " yield - moment would decrease as the original load increase , but the original load would n ' t remarkably influence the ultimate flexural capacity
    同时,程序计算结果表明,加固梁在二次受力的作用下,屈服弯矩随着初始荷载的增加而减小,但极限抗弯承载力受初始荷载影响较小。
  • The application of modified asphalt becomes necessary in the construction of high - grade road , as the traffic and wheel load increases . the object of research work for compatibility of modified asphalt is to the high - point of modifying effect
    随着交通量的增大、轴载的增加,在高等级公路的建设中改性沥青的应用势在必行,通过改性沥青的配伍性研究可使沥青的改性效果达到最佳。
  • The test results show that the gross weight increases 8 tons while the tare weight reduces nearly 1 ton , and the tare ratio reduces from 0 . 52 to 0 . 4 . it enables the carry load increases 9 tons to up 40t which greatly improves the transportation efficiency
    试验结果表明,该车结构设计合理,强度刚度满足要求,在车辆总重增加8t的情况下,自重降低了近1t ,自重系数由0 . 53减小到0 . 388 ,使载重增加了9t ,达到40t ,极大地提高了米轨货车的运输效率。
  • From the above analyses , the conclusions can be made as followed : under the present load condition , suzhou urban mv / lv distribution power network should have the sustainability ; when the load increases by 20 % or 40 % , a few mv / lv lines will be unable to meet the load demand
    从以上几个方面分析,得出“研究”的结论。即在当前负荷下,苏州城市中低压配电网应当具有承受的能力;而当负荷发展到1 . 2 、 1 . 4倍时,将有少部分中低压线路不满足负荷需求。
  • High speed - railway is doubtless to bring new vital force for railway transportation . but with the speed and the load increasing , the motivity between wheel and rail increases rapidly which can bring the kind of damage to vehicle and line and more seriously can lead digression
    高速铁路无疑为铁路运输带来了新的生机,但随着铁路客运运行速度的日益提高以及货运运载重量的不断增加,轮轨之间的相互动力作用就会急剧增加,对车辆及线路带来各种损坏,甚至发生脱轨。
  • Through defining collision probability , collision probability coefficient , minimum feasible probability , tiny probability and maximum feasible collision times , the method for calculating maximum delay of network is clarified with the concept of maximum feasible collision times . it is illustrated that maximum delay of ethernet becomes bigger with its load increase
    定义了冲突概率、冲突概率系数、最小可能概率、微小概率、最大可能冲突次数等概念,用最大可能冲突次数这一概念,阐明了网络最大延时的计算方法,并举例说明了随着网络负荷的增加,网络最大延时也相应的增大。
  • At present with the age of bridges builted long , vehicle load increasing and strength of bridges reducing , people have to inspect and evaluate the strength of bridges . since there are so many bridges to inspect and evaluate , the rapid and accurate methods are in need . crack is one of the most important characteristics of reinforced concrete girders
    目前随着桥梁的修建时间的日渐久远,交通荷载的不断增长对于桥梁的承载能力的要求越来越高,桥梁的承载能力逐渐降低,从而要求人们对于桥梁的承载能力进行检测评估,而众多数量的桥梁需要检测,使得快速、准确的评估方法受到关注。
  • The influence on the shear resistance of columns by the axial loads includes two aspects : the one is that the axial load enhances the concrete strength of column in the inclined compression zone and the other is that the axial load increase the stress of the concrete of column in the inclined compression zone so that the shear resistance of column turns down
    考虑轴力对柱抗剪承载力的影响,主要体现在轴力对斜压带混凝土强度折减系数提高的有利影响和轴力增加了斜压带混凝土的应力从而减少了柱的抗剪承载力的不利影响两方面,提出了考虑轴力影响的用于受剪的斜压带混凝土抗压强度f ~ (
  • The bridges are pivotal stronghold of the whole road . it becomes more and more popluar that some existing bridges betray multifarious structure damage and the limitations below the anticipative functions inevitably by reason of structure aging or vehicle load increasing or adverse environment or maintenance deficiency . lt results in not only the local bottleneck of the line and hidden trouble to the passing vehicle if the defective bridges are not duly maintained and reinforced . as a result , the bridge evaluation is specially important to the maintenance and strengthening . futhermore , we can not demolish and rebuild only but adop corresponding measures according ad temporal condition when the bridges are deemed to have defectiveness . so it accords with the situation of a country that the reinforcement and other upgrade measures aim at the bridge attention
    由于结构自然老化、车辆荷载增加、不利环境影响以及养护维修欠缺,一部分桥梁不可避免地要暴露出各种结构损伤和既有桥梁不满足规定功能要求的问题越来越普遍。如果这些技术状况不佳的桥梁得不到及时的维修和加固,不仅会造成整条线路的局部瓶颈,而且还会对通行的车辆造成极大的隐患。因此,桥梁评估作为桥梁维修和加固的依据就显得尤为重要;此外出现了技术状况不佳的桥梁应根据实际情况采取相应的措施,而不能仅仅采取拆除重建的方法,因此加固和其他升级方法是目前比较符合中国国情的桥梁改造措施。
  • On the basis of investigating and analyzing the economy development lev el of three gorges electric power aim market , the paper has studied the total electric power consumption level of three gorges electric power aim market , load increasing rate and the potential of electric power consumption , settled the base of establishing marketing strategy
    在调查分析了三峡电力目标市场的经济发展水平的基础上,研究了目标市场的总体用电水平、负荷增长率及电力消纳潜力,为营销策略的制定打下基础。
  • 更多例句:  1  2  3  4
  • 推荐英语阅读
load increase的中文翻译,load increase是什么意思,怎么用汉语翻译load increase,load increase的中文意思,load increase的中文load increase in Chineseload increase的中文load increase怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。
Last modified time:Sun, 10 Aug 2025 00:29:56 GMT

说出您的建议或使用心得